ENGINEERING BASED ON EXPERIENCE
The continuous improvement of TurboLogics® Modular Turbine Control System. is based on a long chain of experience. Over 1200 MW installed power generation capacity runs with a retrofit or upgrade control system by IBW Engineering.
Outdoor Turbine

IBW Milestone projects since 1995:

2009 commissioning of TurboLogics turbine control systems:
- 4 units Diesel fired 11D gas turbines
- Saudi Electricity Company at Makkah Power Plant

2009 commissioning of BBC SECONTIC retrofit:
- Hydroelectric Turbine- / Pump-station
- Kraftwerke Oberhasli, Switzerland

2008 commissioning of TurboLogics turbine control system:
- Gas fired 9D gas turbine
- Process control system with new low voltage MCC panels
- Saudi Cement Company at Hofuf Plant

2006/07 Installation and commissioning of 2 TurboLogics turbine control systems:
- Dual fired 11L gas turbines
- Exxon Mobil plant in Nigeria
- GT2 upgrade in June 2006
- GT1 upgrade in February 2007

2005/06 Development of TurboLogics modular turbine control system based on Siemens PCS7 process control.

2005 UHT Plant for Nestlé Basel (subcontracting TRINOX AG)

2004 Evaluation of data archiving and reporting system in Waste Incineration Plant (KVA Thurgau)

2004 Beverage Pasteurizing for Cardinal Fribourg (subcontracting Trinox AG)

2004 Optimization of PLC Software in Waste Incineration Plant (KVA Thurgau)

2004 Soft-drink mixing module for Mineral Quelle Zurzach (subcontracting Trinox AG)

2004 Installation and commissioning of Hydraulic Control Module in a 70MW Gasturbine

2003 Control system upgrade in Feldschlösschen (Feldschlösschen Getränke AG, Switzerland)

2003 Engineering of entrance doors to BOB (Berner Oberland Bahn) railway cars (subcontracting Zbinden Engineering)

2002 Implementation of IBW control Module "PLC-SECONTIC" (gas turbine sequencer) in Cazenga Powerstation, Luanda Angola (1x31MW) (subcontracting Alstom Power)

2001 Implementation of IBW control Module "PLC-SECONTIC" (gas turbine sequencer) in Powerplant 8, Riyadh Saudi Arabia (20x50MW) (subcontracting Alstom Power)

2001 Technical consultant in gas conversion project Powerplant 8, Riyadh Saudi Arabia (20x50MW) (subcontracting Alstom Power)

2000 Extended upgrade (including SCADA) of CIP-installation (cleaning in place) for Nestlé Basel

2000 Extended upgrade (including SCADA) at Heineken Switzerland (Chur), (subcontracting TRINOX AG)

1999 Extended upgrade (including SCADA) of Mayonnaise- and Sauce-Mixer at Nestlé Deutschland Thomy-Werk Karlsruhe (subcontracting TRINOX AG)

1998 Control System upgrade (Filtration) at Heineken Switzerland (Wintethur), (subcontracting TRINOX AG)

1997 Technical Consultant in control system upgrade for rehabilitation of ShahjBazar Poerstation. Bangladesh (4x16MW) (subcontracting ABB Kraftwerke)

1997 Control System upgrade (Hefe-Dosage und -Reinzucht) at Cardinal Switzerland, (subcontracting TRINOX AG)

1996 Technical Consultant in control system upgrade for LOW-NOX burner conversion of gas turbine type GT9 at Stadtwerke Bochum, Germany (subcontracting ABB Kraftwerke)

1996 Control system modifications (Würzekühlung, Drucktank) in Feldschlösschen Getränke AG (subcontracting TRINOX AG)

1995 Control system modifications (Milchaufbereitung und CIP Anlagen) in cheese factory BAER AG Weichkäserei AG (subcontracting TUCHENHAGEN AG)

1995 Extended upgrade (including SCADA) (KEG-Kurzzeiterhitzung, Pufferung) at Hürlimann Zürich (subcontracting TUCHENHAGEN AG)